SA Athletics Stadium
The SA Athletics Stadium involved fully replacing the existing nine-lane athletics track with a new synthetic gel surface.
The scope of the project also included infield turf replacement, construction of new change room amenities, and upgrading of the security and stadium entrance facilities.
One of the major challenges faced on this project was that the track works were only able to be conducted when there was no chance of rain or residual surface moisture , with suitable ambient temperatures above 18 degrees. Given the unusually wet spring that was encountered in 2022, the project had to capitalise on any suitable weather window in order to complete the works on time, prior to the commencement of planned Track and Field events.